Notice the running motion. |
 |
|
 |
|
 |
|
 |
|
 |
|
 |
(12) 3/8" x 6" Galvanized Bolts at each corner |
 |
|
 |
Deck Cut, The corner in this view is the center of steps at 51/2 ft
wide and will be centered with Dock. |
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
At about 8pm today we had the dock on the water and was moving it around
the lake front. |
|
|
| Day Two |
|
 |
|
 |
|
 |
|
 |
|
 |
Framing Step |
 |
Putting edge trim on |
 |
|
 |
New Deck Support |
|
|
| Day Three |
|
 |
|
 |
Angle Iron used for strong ramp connections |
 |
|
 |
|
 |
Ramp connected to 4x4 plus 2x8 with (2) holding post 2 ft in cement and
rocks; this is then connected to the deck through (4) 2x12 step stringers. |
 |
View at the end of the day |